
Price Price on application
Details | |
|---|---|
| Boiler | |
| Outer dimensions length (cm) |
|
| Switchable | |
| Number of fountains (pcs) |
|
| Number of toilets (pcs) |
|
| Mechanical ventilation | |
| Shower (pcs) |
|
| Number of sinks (pcs) |
|
| Connection (A/pole) |
|
| Number of urinals (pcs) |
|
| Outer dimensions height (cm) |
|
| ladies/gents separate | |
| Outer dimensions width (cm) |
|
| Number of fountains/sinks (pcs) |
|
Key Features
All rates excl. 21% VAT. They also exclude costs for the following: maintenance, fuel, oil, wear and tear, transport, cleaning, accessories and various attachments, any environmental taxes and surcharges for damage waiver and fire/theft schemes.
If you choose delivery, transportation costs will apply.
Rates are based on daily rates or weekly rates, unless a machine has an hour counter. In this situation, the daily rate is based on 8 operating hours and the weekly rate on 40 operating hours.
A surcharge applies for additional operating hours. The weekend rates (Friday to Monday inclusive) are based on use at the weekend. For more information please check Hiring: how it works.
