Want to hire directly? +36 24 407744

Cantilever scaffolding

Code 11974

Details

Working load max. (kg/m²)
  • 200

All prices excl. 27% VAT and exclude costs for maintenance, fuel, oil, wear and tear, transport, cleaning, accessories and various attachments, any environmental taxes and surcharges for damage waiver and fire/theft schemes.

Daily rates are based on hire/use of maximum 24 hours, and the weekly rates on hire/use of maximum 168 hours, excluding machines with an hour counter; in such cases the daily rate is based on 8 operating hours and the weekly rate based on 40 operating hours. An surcharge applies for additional operating hours.

The weekend rate (Friday to Monday) is based on hire/use of maximum 72 hours (Sunday is not calculated in the price).

Key Features

  • compatible with wide and narrow mobile scaffolding
  • consisting of just 4 components (cantilever scaffold, railing, toe boards and platform)
  • frame has roof-support bars that rest on roof
  • meets EN12811
  • Transport by lorry
  • Safety gloves
  • Safety shoes
  • Safety helmet